Dec 2020
COVID RESILIENT DESIGN IS MORE IMPORTANT THAN EVER FOR-
- Repurposing existing buildings
- Design of new facilities
- Disaster rebuilding
- Space planning to discretely enhance: Social Distancing, sanitizer dispensing, personal protective gear disposal, trash disposal, laundry
- Security systems
AIR SYSTEMS-
- Negative air pressure with forced air systems, fresh air intake, heat exchangers
- Fresh air flow (from low to high, from sunny side to shady cool side
- Avoid common area public elevators, stair case, and hall ways
- Have separate entrances
SUSTAINABLE WATER SECURITY-
- With all the hand washing, laundry & general wipe downs & cleaning- water source, water collection, water reclamation & filters , water storage
SUSTAINABLE POWER SECURITY (CALLED THE WATER-ENERGY NEXUS)-
- Water system delivery methods require power for pumps to run.
- Smart system water monitoring requires power to run
- Internet , news updates, Zoom capacity, keeping phones & laptops charged all require power ,
CONVERT YOUR VACANT BUILDING TO THESE ESSENTIAL SERVICES TO OPTIMIZE OCCUPANCY:
- First responders facilities, government offices, healthcare facilities, public services and sanitation, child care programs, fulfillment centers, transportation and delivery, testing facilities, laboratories, utilities & infrastructure , renewable energy farms, energy production & distribution, water and wastewater, agriculture and food production, take-out food pick up
- Nonprofits & social service organizations,
- Critical trades (construction workers, electricians, plumbers, etc.)
- Critical retail (i.e., grocery stores, hardware stores, mechanics). communications
- Housing
PREFAB, MODULAR & HYBRID COMBINATIONS:
- Design of building improvements using metaphoric plug & play components to reduce site built construction & assembly, reduce carrying costs
LET CRENSHAW BE OF SERVICE TO PROVIDE YOUR SOLUTION-
- Collect documentation on existing improvements , research what uses are currently allowed in that zone, identify what uses or mix of uses can be supported by your property’s parking & transportation options, due diligence zoning feasibility study with super preliminary design sketch, followed by soft costs and hard costs for budget analysis, assemble & manage consultant team, time estimates for production of plans & issuance of permits, request for proposal (RFP) to general contractors
- Schedule a feasibility consultation to transform your property